Agreeing edits to a contract: what to look at in the new draft
The counterparty returned a file with edits — how to see quickly what changed in substance
The most expensive mistake in negotiation is to sign a file that is “almost the same” and miss an edit in one paragraph on penalties or unilateral withdrawal. Below is a way to work with a new draft, and a list of areas where edits are often critical.
Upload your original and the counterparty’s edits — get the differences in substance by term:
Why “skimming it” is not enough
- Edits are often pinpoint: one word changes how risk is allocated
- In a PDF or a scan it is hard to see what was added in the middle of a section
- The counterparty may send a clean copy with Word track changes turned off
For two Word files, the built-in comparison sometimes helps — see how to compare two documents in Word. For a PDF, and for a reading by commercial terms, an online comparison is more convenient.
Areas to check first
Price and payment
- The amount, currency, or stage order changed
- A right to change the price unilaterally appeared
- Payment deadlines or advance-payment terms moved
Deadlines and scope
- The deadline was shortened with no change in scope
- “Any additional work” was added with no extra pay
- The acceptance criteria changed
Liability and penalties
- The penalty rose for your side only
- A liability cap appeared for the counterparty
- Compensation for “all losses,” with no limits, was added
Termination and disputes
- Unilateral withdrawal became available to one side only
- The venue / pre-claim procedure changed
- Return of the advance on termination became harder
A working negotiation process
- Keep the original draft and the file with edits separately
- Compare the versions and write down only the differences in substance
- Mark “accept / revise / reject” on each point
- Send the counterparty a list of objections, not “the whole file”
- Check the final text for risks once more, as a whole
Comparing versions shows what changed. A risk check shows how dangerous the final text is. Those are different tasks — see comparing contract versions.
Checklist before the final signature
- Every critical edit was accepted or rejected deliberately
- Annexes and references to the statement of work or estimate are current
- No one-sided right was added “quietly”
- The final file matches the agreed draft
Compare drafts in DocumentCHEK
Upload version A and version B — the service will highlight changes to price, deadlines, liability, and termination.