Supply contract: what to check before the first shipment
Goods, deadlines, transfer of risk, acceptance, and penalties — so the dispute does not start at the warehouse
A supply contract usually “breaks” not in a neat preamble, but on the first shipment: the wrong assortment, a dispute over when risk passes, a refusal to accept, a late payment. Below is what to check in the text before signing and before the goods leave the warehouse.
This is a guide, not legal advice. Labeling, foreign trade, and industry GOST standards need their own annexes — do not stop at a general template.
The counterparty sent its own supply version — compare it with yours, or run the file for one-sided terms:
1. Subject: what exactly is supplied
- Name, article, quantity, unit of measure — in the contract or the specification
- Quality: GOST / technical specifications / sample; permitted deviations
- Packing and labeling — whose requirements, and who pays for repacking
- Whether the assortment can be changed by an addendum or an order without a new “paper”
If the subject is vague (“goods as agreed by the parties”), a short-delivery dispute is almost inevitable. The specification for each shipment should be an annex, or should refer unambiguously to an order.
2. Deadlines and the delivery procedure
- Deadline: a calendar date, a period, or “within N days of payment / the order”
- Lots: minimum volume, schedule, the buyer’s right to refuse the remainder
- Pickup or delivery; basis (supplier’s warehouse / buyer’s warehouse / terminal)
- What counts as delay, and from which date the penalty runs
3. Transfer of risk and title
The classic conflict: the goods were damaged in transit, and the contract is unclear whose risk it is. Fix the moment: handover to the carrier, signing the waybill at the buyer’s warehouse, scanning at the terminal. Separately — who insures the cargo, and in whose favour.
- Transfer documents: waybill / UPD / acceptance certificate — and in what form (paper / EDI)
- Discrepancies in quantity and quality: inspection period and claim period
- Latent defects: period and procedure for notice
If the closing documents go into EDI and the contract stayed in Word, check how the documents fit together: acceptance certificate and UPD in EDI vs a paper contract.
4. Price, payment, return
- The price is fixed or formula-based; VAT is inside the price or on top
- Prepayment / deferral / letter of credit; the moment of payment (invoice, UPD, acceptance)
- The right to withhold payment on a quality claim — whether it exists, and in what amount
- Return of unsold goods or defects: who carries them, and at whose expense
5. Liability and unilateral exit
- Penalty for late delivery and for late payment — symmetry of the rates
- Liability cap (a percent of the lot / of the contract) — whether it wipes out the loss
- Unilateral withdrawal: for which breaches, and with what notice
- Force majeure: the list, the notice period, the fate of the prepayment
For sellers whose “supply” also runs through a marketplace offer, warehouse risk on the platform is a separate topic: the Wildberries and Ozon offer. This checklist is about the B2B contract between supplier and buyer.
Checklist before the first shipment
- The specification / order matches what is being loaded
- The moment risk passes, and the set of documents, are clear
- The inspection and claim period is realistic for your logistics
- Payment is tied to a clear event (UPD, acceptance, deferral of N days)
- Penalties and liability caps are read in full
- Contacts for claims and EDI are stated and working
Related reading
- How to check a contract for risks
- Hidden clauses in a contract
- Agreeing edits in a contract
- Contract with fulfillment and 3PL
Short conclusion
Before the first shipment, what matters most is a clear subject, the moment of risk, acceptance rules, and symmetric liability. A template “like everyone else’s”, without a specification and inspection deadlines, is almost always more expensive than an hour of reading the text.
Check a supply contract in DocumentCHEK
Upload the file — get a risk review before shipment. If the counterparty returned edits, compare the two versions side by side.
Need a draft from scratch? Draft a contract online.